Help me decided which way to bid this
Trying to be reasonable but keep the lights on. Still new to bidding and pricing. My work is pretty decent, it doesnt look bad. ive gotten a 5 star rating and all my work by referral, so it speaks for itself. I talked to a pro and he told me im way under bidding. Ive had customers tell me i under bid lol so im trying to dial it in help me figure this out
Time and materials
100/hr
92/hr 2 guys at 23hr each
144 12 nozels
240 12 Heads
60 for pressure regulator
30 (unknown 4< fittings)
150 50ft> worth of pipe
OR
Proposal
145 for 16 heads
140 man hours
64 for 16 sprinkler nozels
120 to install heads 7.5each
150 trenching
1.5 prr foot installed
10 for fittings
Total 644M 840total
Proposal needs to be tweaked, after talking to pro it seems a bit low. Now I've trippled my material prices. Let me know what you think
Just re worked the proposal, and to me this seems to high but idk.
Proposal
432 for 16 heads
552 6 man hours
144 for 16 sprinkler nozels
120 to install heads 7.5each
150 trenching
1.5 prr foot installed
10 for fittings
Total 1443total
Trying to be reasonable but keep the lights on. Still new to bidding and pricing. My work is pretty decent, it doesnt look bad. ive gotten a 5 star rating and all my work by referral, so it speaks for itself. I talked to a pro and he told me im way under bidding. Ive had customers tell me i under bid lol so im trying to dial it in help me figure this out
Time and materials
100/hr
92/hr 2 guys at 23hr each
144 12 nozels
240 12 Heads
60 for pressure regulator
30 (unknown 4< fittings)
150 50ft> worth of pipe
OR
Proposal
145 for 16 heads
140 man hours
64 for 16 sprinkler nozels
120 to install heads 7.5each
150 trenching
1.5 prr foot installed
10 for fittings
Total 644M 840total
Proposal needs to be tweaked, after talking to pro it seems a bit low. Now I've trippled my material prices. Let me know what you think
Just re worked the proposal, and to me this seems to high but idk.
Proposal
432 for 16 heads
552 6 man hours
144 for 16 sprinkler nozels
120 to install heads 7.5each
150 trenching
1.5 prr foot installed
10 for fittings
Total 1443total